Treatment facility projects
§ Southeast Plant: Secondary treatment system upgrade; new wet-weather improvements; odor, visual and noise control; southeast outfall repair
§ Oceanside Plant: Class A treatment of biosolids, grit handling improvements
§ North Point Facility: Sedimentation tank upgrades, odor control improvements, outfall repair
§ Force Mains/Pump Stations: Repair and upgrades to Channel Pump Station Force Main and the North Shore Force Main
§ New Digester Facility
Collection system projects
§ Sewer repair and replacement
§ Transport storage box and tunnel repair
§ Numerous flood control improvements in the Cayuga, Mission, Channel, and Richmond areas/neighborhoods
§ Odor control projects
Low Impact Development/stormwater reduction projects
§ Rainwater harvesting
§ Disconnected roof drains
§ Eco-roofs
§ More street trees
§ Permeable surfaces
§ Daylighted streams
§ Swales
Bayside Recycled Water Facility
Southeast Plant Digesters Facility
§ Improve seismic reliability, biosolids treatment, energy recovery
§ Minimize odors
§ Determine best site for new digesters among three feasible locations analyzed during development of draft Master Plan
Next: Low Impact Development